Traffic Incident Management (TIM) Performance Measures
(June 12, 2014)

Presenter:   Susanna Hughes Reck
Presenter's Org:   Office of Infrastructure, Federal Highway Administration (FHWA)

HTML version of the presentation
Image descriptions are contained in brackets. [ ]
Back to Webinar Files

T3 Webinars are brought to you by the Intelligent Transportation Systems (ITS) Professional Capacity Building Program (PCB) of the U.S. Department of Transportation's (U.S. DOT) ITS Joint Program Office (JPO). References in this webinar to any specific commercial products, processes, or services, or the use of any trade, firm, or corporation name is for the information and convenience of the public, and does not constitute endorsement, recommendation, or favoring by the U.S. DOT.


Slide 1:  Traffic Incident Management (TIM) Performance Measures

T3 Webinar
Traffic Incident Management (TIM) Performance Measures

June 12, 2014
Susanna Hughes Reck
Office of Transportation Performance Management

[This slide contains a graphic image of three circles, a straight and curved line, and circles and squares in the places where the lines intersect.]

Slide 2:  Objectives

Slide 3:  MAP-21 Background-Performance

Slide 4:  11 Inter-related Rulemakings

http://www.fhwa.dot.gov/tpm

[This slide contains a table that lists eleven interrelated rulemakings of the U.S. DOT Implementation of MAP-21 Performance Provisions, grouped into five color-coded sections. To the right of the table are timelines for each of the five groups, covering 2014 and 2015. These timelines show the comment periods and the effective dates for the anticipated coordinated performance measures. A green square on each timeline shows when each comment period occurred/is occurring.]

Slide 5:  Overview of Performance Management

Slide 6:  Performance Measure Groupings

Program Measure Category
Status I
  • Serious Injuries per VMT
  • Fatalities per VMT
  • Number of Serious Injuries
  • Number of Fatalities
Status II
  • Pavement Condition on the Interstates
  • Pavement Condition on the Non-Interstate NHS
  • Bridge Condition on NHS
Status III
  • Traffic Congestion
  • On-road mobile source emissions
  • Freight Movement
  • Performance of Interstate System
  • Performance of Non-Interstate NHS

Slide 7:  FHWA Proposal Comment Periods – 2014

[This slide contains a timeline for FHWA Proposal comment periods in 2014 from March through December. The timeline covers stages one through three in the proposal comment period. The first stage will focus on safety and will include 3 Notices of Proposed Rulemaking (NPRMs). The Safety Performance Measure (PM) and HSIP NPRMs were published in March and their comment period ends June 30, overlapping with the Metropolitan and non-Metropolitan Statewide Planning NPRM (out for comment until the end of August). The second stage will focus on infrastructure condition and management. The two NPRMs in this stage, Asset Management and Infrastructure PM, are scheduled to be published in August and include comment periods of 60 and 90 days, respectively. The third and final stage is the System Performance+ PM, which includes a 90-day comment period.]

Slide 8:  Rollout of the NPRMS

Slide 9:  NPRM Status

http://www.dot.gov/regulations/report-on-significant-rulemakings

Performance Area/Element NPRM Target
Status I: Safety Measures March 11, 2014
Highway Safety Improvement Program (*60 day comment period.) March 28, 2014
Metro and Statewide Planning June 2, 2014
Status II: Infrastructure Condition Measures August 2014
Highway Asset Management Plan (*60 day comment period.) August 2014
Status III: System Performance+ Measures October 2014
Public Transportation – ANPRM closed on 1/2/2014

Slide 10:  Additional FHWA Resources

Slide 11:  Thank You!

[This slide contains a graphic image of three circles, a straight and curved line, and circles and squares in the places where the lines intersect.]